Do Solar Panels Work During a Power Outage? The Facts
Do solar panels work during a power outage? Most grid-tied systems shut off by design. Learn what keeps your lights on and what backup adds.
Read article →You have three quotes on the table, all with similar price per watt, and every salesperson says the company is "fully licensed and certified." If that claim is false, you find out after the panels are on your roof: a permit that never closes, an insurer that will not cover the work, or a warranty from a company that no longer exists. Checking takes about fifteen minutes per company, and it is the cheapest risk reduction in the whole buying process.
A solar installer license is a state-issued legal permission to perform electrical or contracting work for pay, and it is separate from NABCEP certification, which is a voluntary credential from the North American Board of Certified Energy Practitioners. This guide shows how to verify both, plus insurance, and what to do when the answers do not match.
They answer three different questions. A license answers "is this company legally allowed to do this work here?", certification answers "has an independent body tested this person's solar knowledge?", and insurance answers "who pays if the work damages your home or injures a worker?" A company can hold any one of them without the other two.
| Credential | Who issues it | Required by law? | What it proves |
|---|---|---|---|
| Contractor or electrical license | State or local licensing board | Usually yes, rules vary by state | Legal permission to do the work, and a record of complaints or discipline |
| NABCEP certification | NABCEP, a private certification body | No, with some local program exceptions | An individual has met experience and exam requirements for solar work |
| Liability and workers' compensation insurance | An insurance carrier | Usually yes for employers | Damage and injury claims have a payer other than you |
| Manufacturer installer status | The equipment maker | No | The installer can register products for the maker's extended warranty |
Two details trip people up. NABCEP certifies individuals, not companies, so a company can truthfully say "we employ NABCEP-certified staff" while the crew on your roof holds no certification. And licensing rules differ widely: some states issue a dedicated solar contractor license, others require a general or electrical contractor license, and many have the electrical portion done under a licensed electrician's number.
You verify it on the government licensing site, never from a PDF or a logo the salesperson sends you. Search for your state's contractor licensing board, use its public lookup, and match the record to the exact legal name on your contract.
The last step catches a common problem. Some sales companies sell the system under one brand and subcontract the install to a different, separately licensed firm. That is legal in many places, but the licensed company on the record should be the one named in your contract, and you should know who will be on your roof.
No, NABCEP certification is not a legal requirement in most places, but it is a useful signal of installer skill. It is a voluntary credential, and some local incentive programs or utilities may ask for it, so check the rules where you live.
To verify it, use the certificant lookup on the NABCEP website at nabcep.org and search for the person, not the company. Then ask one direct question: "Will a certified person design my system and be on site during installation?" A certification held by an office employee who never visits job sites tells you little about your install.
Treat certification as a tiebreaker, not a substitute for a license. An active license with a clean record and a solid insurance certificate matters more than a credential on a business card. If two companies are otherwise equal, the one that puts a certified professional in charge of your project has reduced one source of design and wiring mistakes.
Ask for a certificate of insurance, and have it sent to you directly by the installer's insurance agent rather than handed over by the salesperson. You want to see two policies: general liability, which covers damage to your property, and workers' compensation, which covers injuries to the crew.
Read three fields on the certificate: the policy period, the named insured and the coverage limits. The policy period must include your installation dates, and the named insured must match the licensed company. If the installer uses subcontractors, ask whether those crews carry their own workers' compensation, because an uninsured worker injured on your roof can become your problem.
This matters more with rooftop work than most home projects. Roof penetrations can leak, and a fall from a roof is one of the most serious risks in the building trades. A missing policy is not a paperwork gap; it shifts the cost of an accident toward your homeowner's policy.
Walk away when a company cannot give you a license number, when the number does not match the business name, or when the status is anything other than active. Those three facts alone are enough to end the conversation, whatever the price.
The permit point deserves emphasis. The permit for a solar system is normally pulled under the licensed contractor's credentials, and the inspection that follows is what lets the utility approve interconnection. If the installer pushes the permit onto you, the legal responsibility for the work can shift to you. Our guide to permits and interconnection timelines explains why the paperwork order matters.
Yes, the manual lookup is the part most homeowners abandon halfway. Doing it well means repeating the license, certification and insurance check for every company you invite, across different state boards with different search tools, and then re-checking when the quote drags on for months.
Top Solar Services is a directory of solar contractors, and every listing goes through a human-led verification before it appears. You can browse the solar company directory and compare listings by state, then still run the license lookup above on the two or three you shortlist. Verification at the directory level narrows the field; it does not replace your own check of the contract name and the insurance certificate.
The most common objection is that this feels insulting, or that the installer has been in business for years and does not need to prove anything. A reputable installer expects it. They hand over a license number and an insurance certificate routinely, because every commercial customer and every lender asks.
The second objection is time. Each lookup takes minutes, and you only need to do it for the final two or three companies, not every name you find online. If a company drags its feet on a document that it must already have on file, treat the delay as information about how it will handle your warranty claim later.
Shortlist two or three installers, run the six-step license check on each, request the insurance certificate directly from the agent, and put the license number into the contract itself. If you would rather start from contractors that have already passed a verification step, the Get Matched form sends your project details to up to five best-fit contractors who then contact you directly. It is free for homeowners, and you still get to run your own checks on whichever companies reply.
Do solar panels work during a power outage? Most grid-tied systems shut off by design. Learn what keeps your lights on and what backup adds.
Read article →How many solar quotes should you get? Three comparable quotes is the practical answer. Learn when to add a fourth and how to compare bids fairly.
Read article →Does shade ruin solar panels? See how partial shade cuts output, when optimizers or microinverters help, and how to judge your roof before you buy.
Read article →